Impianto Idroelettrico Enel SPA

Terminated

Terminated

Impianto Idroelettrico Enel SPA - San Giacomo al Vomano (TE)

San Giacomo al Vomano, San Giacomo al Vomano (TE)

All the interventions, carried out underground, are the following:
- three tunnels, respectively of 870m x 11,06mq of frontal width, 244m x 28,80mq and 44m x 36,33mq;

- an exhaust and suction tunnel, 2,750m length and 3,90m diameter carried out with a full section cutter;

- a 562m pipe shaft and a 611 ml. cable shaft, both with a diameter of 5,95m using, for the first time in the world, the Down Reamer Robbins excavation system

 

 

Terminated